<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Visit London Blog &#187; handball</title>
	<atom:link href="http://blog.visitlondon.com/tag/handball/feed/" rel="self" type="application/rss+xml" />
	<link>http://blog.visitlondon.com</link>
	<description>Enjoy the very best of London</description>
	<lastBuildDate>Fri, 17 May 2013 11:59:38 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.5.1</generator>
		<item>
		<title>The London 2012 Olympics Handball Arena Construction Completed</title>
		<link>http://blog.visitlondon.com/2011/05/the-london-2012-olympics-handball-arena-construction-completed/</link>
		<comments>http://blog.visitlondon.com/2011/05/the-london-2012-olympics-handball-arena-construction-completed/#comments</comments>
		<pubDate>Fri, 13 May 2011 15:30:15 +0000</pubDate>
		<dc:creator>Zoe Craig</dc:creator>
				<category><![CDATA[London]]></category>
		<category><![CDATA[2012]]></category>
		<category><![CDATA[goalball]]></category>
		<category><![CDATA[handball]]></category>
		<category><![CDATA[handball arena]]></category>
		<category><![CDATA[modern pentathlon]]></category>
		<category><![CDATA[olympic park]]></category>
		<category><![CDATA[Olympic Venues]]></category>
		<category><![CDATA[olympics]]></category>

		<guid isPermaLink="false">http://blog.visitlondon.com/?p=21094</guid>
		<description><![CDATA[The construction of the London 2012 Handball Arena is now complete. This makes it the third venue on the Olympic Park to reach completion: the first to be finished was the Velodrome; the second, the Olympic Stadium. As well as ...]]></description>
				<content:encoded><![CDATA[<p><img class="alignnone size-full wp-image-21095" title="Aerial view of the Handball Arena. Picture taken on 24 Mar 11 by Anthony Charlton" src="http://dx9rjq5h30myv.cloudfront.net/wp-content/uploads/2011/05/handball_arena_mar11.jpg" alt="" width="539" height="340" /></p>
<p>The construction of the London 2012 <a href="http://www.visitlondon.com/attractions/detail/9356763">Handball Arena</a> is now complete.</p>
<p>This makes it the third venue on the <a href="http://www.visitlondon.com/2012/venues/olympic-park-a-new-sporting-complex-for-london">Olympic Park</a> to reach completion: the first to be finished was the <a href="http://www.visitlondon.com/attractions/detail/9356761">Velodrome</a>; the second, the <a href="http://www.visitlondon.com/attractions/detail/9356767">Olympic Stadium</a>.</p>
<p>As well as <a href="http://www.visitlondon.com/events/detail/9385926">handball</a>, the new Handball Arena will also host the fencing part of the <a href="http://www.visitlondon.com/events/detail/9327876">modern pentathlon</a> and the <a href="http://www.visitlondon.com/events/detail/9386318">goalball</a> competition during the <a href="http://www.visitlondon.com/2012/paralympic-games/">Paralympic Games</a>.</p>
<p><strong>Handball Arena: Sustainability</strong></p>
<p>The Handball Arena was designed and built with <strong>sustainability </strong>as a priority.</p>
<p>The copper cladding has a high recycled content, while the arena can be lit naturally, through 88 rooftop sun-pipes, achieving annual energy savings of up to 40% and greater illumination than similar-sized conventional lights.</p>
<p>During TV broadcasts or poor weather, the system can be switched off and electrical lighting used instead.</p>
<p>Water usage at the venue is saved by 40% through a rain-harvesting system that feeds into toilets and other systems.</p>
<p><strong>Handball Arena: Legacy</strong></p>
<p><strong><img class="alignnone size-full wp-image-21096" title="Inside the Handball Arena" src="http://dx9rjq5h30myv.cloudfront.net/wp-content/uploads/2011/05/inside_handballarena_edit.jpg" alt="" width="539" height="360" /></strong></p>
<p><strong>After the Games</strong>, capacity in the Handball Arena will be increased to hold up to 7,500 spectators. It&#8217;ll become a multi-use venue for the community, athletics and events.</p>
<p>The removable lower seating means a variety of activities can take place inside, from international competitions to community sports such as basketball, handball, badminton, boxing, martial arts, netball, table tennis and volleyball.</p>
<p>&#8220;It is wonderful to have another permanent sport facility located in the Park which will provide an opportunity for all of these sports to continue to develop in legacy,&#8221; said London 2012 chairman Sebastian Coe.</p>
<p>&#8220;With the venue completed well in advance of Games-time, we can stage handball and goalball <a href="http://www.londonlaunchgames.com/eventsList.asp">test events</a> later this year under similar conditions to Games-time to ensure we get our planning just right.&#8221;</p>
<blockquote><p>The next venue on the list seems to be the Basketball Arena&#8230; Watch this space!</p></blockquote>
]]></content:encoded>
			<wfw:commentRss>http://blog.visitlondon.com/2011/05/the-london-2012-olympics-handball-arena-construction-completed/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

<!-- Performance optimized by W3 Total Cache. Learn more: http://www.w3-edge.com/wordpress-plugins/

Page Caching using disk: enhanced
Object Caching 335/352 objects using disk: basic
Content Delivery Network via Amazon Web Services: CloudFront: dx9rjq5h30myv.cloudfront.net

 Served from: blog.visitlondon.com @ 2013-05-19 15:50:58 by W3 Total Cache -->